EZ Handrail EZG106 Bedienerhandbuch Seite 12

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 23
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 11
Constructing the Upper Glass Channel Assembly
STEP 1:
1. Measure the distance between your existing posts or newly installed EZ Posts. A
more accurate measurement is taken 36” from the deck. (Illustration #5).
2. Subtract a 1/2” from the total measurement to allow your assembly and Top
Post Mount to pass the post without scratching the finish. Example: If the
measurement is 60 inches cut A & B2 to 59 1/2 inches.
3. Cut Top Cap (A ) and Top Glass Channel (B2) to the adjusted measurement.
4. Next, snap Top Cap ( A ) with Top Glass Channel (B2). Keep the ends flush.
Start at one end and press together until you hear the pieces snap, then
continue to the other end. (Illustration #6).
5. After the Top Cap Assembly is snapped together, place the Top Post Mounts (E)
on each end making sure the fastener portion is facing down.
Illustration #5
Illustration #6
(A)
(B2)
Critical Measurement
36”
(E)
www.ezhandrail.com for videos 12
Seitenansicht 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 22 23

Kommentare zu diesen Handbüchern

Keine Kommentare