EZ Handrail EZG106 Bedienerhandbuch Seite 11

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 23
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 10
Installing the Lower Assembly
STEP 1:
1. Attach Mid Support (K) underneath the Bottom Assembly t the midpoint of the
railing section (Illustration 3B).
2. Place the Bottom Post Mounts (D) on each end of the Bottom Channel Assembly
making sure the fastener portion is facing up. (Illustration #4).
3. Attach the Bottom Channel Assembly to your post. (The maximum distance from
the decking / flooring to the bottom of the Bottom Glass Channel Assembly is 3
3/4.”(Illustration #4).
4. Suggestion: The width of a 2x4 is 3 1/2,” some contractors will install the
Bottom Channel Assembly by setting it on 2x4’s at both ends.
5. Fasten the Bottom Channel Assembly Post Mounts (D) to the post using the
appropriate fasteners (J, M, N). (See post detail page if necessary).
6. Secure a third fastener (J) through the side of the Top Post Mount (E) securing
the Bottom Channel Assembly to the Bottom Post Mount. This fastener should
be placed on the outside (non viewable side) of the railing as indicated below.
Repeat at the opposite end.
Illustration #3B
Illustration #4
Spacing is not to exceed 3 ¾” from
the bottom of the channel to the
deck.
(D)
(J)
Midfoot (K)
www.ezhandrail.com for videos 11
Seitenansicht 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 22 23

Kommentare zu diesen Handbüchern

Keine Kommentare